Decoration budget skills budget bargaining should

2022-07-22
  • Detail

Before decoration, the decoration company will provide you with a budget. Usually, the budget price of a decoration company consists of three parts: material cost, labor cost and management cost. Among them, "management fee" contains many contents, including various management fees, rent amortization, taxes, reasonable profits and other factors. Generally, the preferential interest given to you by the decoration company is within the scope of reasonable profits. If you "cut" the price beyond this range, and install

before decoration, the decoration company will provide you with a budget. Usually, the budget price of a decoration company consists of three parts: material cost, labor cost and management cost. Among them, "management fee" contains many contents, including various management fees, rent amortization, taxes, reasonable profits and other factors. Generally, the preferential interest given to you by the decoration company is carried out within the allowable range of reasonable profits. If you "cut" the price beyond this range, and the decoration company hopes to get the project, it will force him to make up for the lost losses in "material" or "work", which is often referred to as "Jerry building"

check whether the drawings are accurate

then, how should we objectively review the decoration budget? Before reviewing the budget, you should review the drawings first. A complete, detailed and accurate set of drawings is the basis of the budget quotation, because the quotation is based on the specific dimensions, materials and processes in the drawings. If the drawings are inaccurate, the budget is certainly inaccurate

whether the engineering projects are complete

you need to check whether all the engineering projects in the budget are complete, whether you have listed all the things you need to do in the budget, and whether you have understated a door or missed the tiling of the kitchen wall and the skirting line in the bedroom. When these missing projects arrive at the site construction, they must still be done, so you have to go through additional procedures and increase another unexpected expenditure

UOM affects the budget result

please pay attention to the UOM in the budget book. In furniture production, the differences between decoration companies are relatively large. For example, when making large wardrobe or bookcase, some companies use "linear meter" and some use "square meter". At this time, you should pay attention to it, because furniture calculated by "square meter", no matter how high and wide, is calculated by multiplying the number of square meters by the unit price, while furniture calculated by "linear meter" has height restrictions

the drawing should be consistent with the budget size

please check the specific quantity of each project in the budget with reference to the drawing. For example, if the floor tile is 50 square meters calculated from the size on the drawing, the budget book should also be about 50 square meters, and the data calculation should be quite rigorous and accurate. For example, the drawing calculation is 50 square meters, while the budget book is 55 square meters, which is an obvious error

the description of materials and processes should be specific

the decoration company should tell you: what materials and processes constitute the price he quoted. If you see such a quotation: "30 yuan square meters of Nippon Paint on the wall", it is obviously not specific enough. first, "Nippon is a brand of paint. It has many products, including interior wall paint, exterior wall paint and wood paint; the interior wall paint is divided into several categories. Secondly, each paint has many colors; when painting, it is usually diluted with 20% to 30% water and then painted twice. For walls with moisture-proof requirements, it should also add a primer before painting; for the treatment of wall base, it is generally necessary to brush an alkyd varnish to seal the bottom, and then scrape putty for 2-3 times to level it Latex paint can be applied only after it is completely dry

special circumstances special budget

wall cracks: the treatment of large-area cracks will be charged separately. In particular, the full plasterboard is usually charged more than 30 yuan per square meter, which is often not reflected in the budget, but it is proposed separately according to the actual situation when it comes to the site construction

floor tile mosaic: some families like to use different colors to form a certain pattern when laying floor tiles, and the cost of this mosaic is usually raised at the time of settlement

waterway and circuit construction: a small part of the reconstruction cost of waterway and circuit in the budget is usually collected in advance. Upon completion, settlement will be made according to the actual quantity